1555-1369

Lean Construction Journal

Lean Construction Institute

Health Score

0 Poor

Metadata coverage

Abstract
ORCID
References
License

Extended metadata coverage

Informational — signals of interoperability and funding across the corpus. Not part of the health score.

Funding

Funder
Award / grant

Affiliation & institutional identifiers

Affiliation
ROR ID

Update policy

Update policy

Your prioritized action plan

Ordered by how many DOIs each fix touches — start here, not with every error at once.

1

Deposit reference lists for 102 records

Deposited references power Crossref's Cited-by links between your articles and the literature.

High impact102 DOIs
2

Add license metadata to 102 records

License metadata tells indexers and readers how each article may be reused.

High impact102 DOIs
3

Attach ORCID iDs across 88 articles

ORCID iDs strengthen author disambiguation and institutional reporting.

High impact88 DOIs

DOIs for this ISSN

Showing the top 5 of 101 DOIs, ordered by correction priority.

# Title Missing Priority Citations
1 Lean Project Delivery System: An Update (10.60164/73d8h1c5c)
References ORCID License
143.14 80
2 Lean Construction: Prospects for the German construction ind… (10.60164/87b3c5e5g)
References ORCID License
141.49 76
3 Site Implementation and Assessment of Lean Construction Tech… (10.60164/e2i9e2h1d)
References ORCID License
138.84 70
4 Transitioning to Integrated Project Delivery: Potential barr… (10.60164/uwvk0fog7)
References ORCID License
136.47 65
5 Lean Construction: Where Are We and How To Proceed? (10.60164/55h8g4h8c)
References ORCID License
122.51 42
6 Sutter Health: Developing a Contracting Model to Support Lea… (10.60164/70f9c0e7d)
References ORCID License
121.74 41
7 Project Alliancing: A Relational Contracting Mechanism for D… (10.60164/b5h4e3h6e)
References ORCID License
120.96 40
8 The Combination of Last Planner System and Location-Based Ma… (10.60164/87i4g2d4i)
References ORCID License
119.33 38
9 An Empirical Examination of the Relationship between Lean Co… (10.60164/a2g0h2d4b)
References ORCID License
116.72 35
10 Creating value: a sufficient way to eliminate waste in lean… (10.60164/a1e5e7b8g)
References ORCID License
106.12 25
11 Why isn't the UK construction industry going lean with gusto… (10.60164/i2h6a6c6f)
References ORCID License
106.12 25
12 Lean Construction as a Strategic Option: Testing its Suitabi… (10.60164/a4g1a8f9e)
References ORCID License
103.52 23
13 Lean principles in industrialized housing production: the ne… (10.60164/03a3c4g7c)
References ORCID License
97.58 19
14 Process Benchmarks: Target Value Design: Current Benchmark (… (10.60164/71a1f5b4f)
References ORCID License
90.31 15
15 Critical Success Factors for Lean Construction: An Empirical… (10.60164/50c6g5h0c)
References ORCID License
88.21 14
16 Analyzing User Costs In a Hospital: Methodological Implicati… (10.60164/a7g7i1d4c)
References ORCID License
88.21 14
17 APPLICATION OF LEAN MANUFACTURING PRINCIPLES TO CONSTRUCTION (10.60164/40g1a6i4g)
References ORCID License
83.55 12
18 Last Planner and Integrated Project Delivery (10.60164/g9c8d8h8a)
References ORCID License
83.55 12
19 Editorial: Lean and Integrated Project Delivery (10.60164/thpzpuygk)
References ORCID License
80.94 11
20 A Lean Modeling Protocol for Evaluating Green Project Delive… (10.60164/51g3a0i0i)
References License
78.41 36
21 Current Process Benchmark for the Last Planner® System of Pr… (10.60164/47e7h7a1b)
References ORCID License
78.10 10
22 What makes the delivery of a project integrated? A case stud… (10.60164/67g8h8b1h)
References ORCID License
78.10 10
23 Relational Contracts -NEC in Perspective Philosophy and Etho… (10.60164/81a6i6a5i)
References ORCID License
75.00 9
24 Lean Construction in the UAE: Implementation of Last Planner… (10.60164/96f4a5e0g)
References ORCID License
75.00 9
25 Lean production, value chain and sustainability in precast c… (10.60164/b7h5f0a8f)
References ORCID License
75.00 9
26 Moving-on — Beyond Lean Thinking (10.60164/78i8a0h6d)
References License
74.57 30
27 PPC2000: Association Of Consultant Architects Standard Form… (10.60164/53f2f2a7h)
References ORCID License
67.73 7
28 Generic Implementation of Lean Concepts in Simulation Models (10.60164/b1e4b3f8i)
References License
65.05 19
29 Relational Contracting – Creating Value Beyond theProject (10.60164/b1d1g5c1d)
References License
63.94 18
30 Step-by-Step Modularity – a Roadmap for Building Service Dev… (10.60164/76g7a3c0h)
References ORCID License
63.38 6
31 Using a design-build contract for Lean Integrated Project De… (10.60164/o99f9ppz9)
References ORCID License
63.38 6
32 Competing Construction Management Paradigms (10.60164/96h4f9b4a)
References License
61.52 16
33 Lean Construction – 2000 to 2006 (10.60164/i2i3a5a8h)
References License
58.80 14
34 Uncovering and Visualizing Work Process Interruptions throug… (10.60164/c5e1b7g1a)
References ORCID License
58.36 5
35 The Impact of Path Dependencies on Lean Implementation Withi… (10.60164/d0a3a6b2d)
References ORCID License
58.36 5
36 Using an integrated 5D & location-based planning system… (10.60164/h9g7i9g7c)
References ORCID License
58.36 5
37 Implementing Integrated Project Delivery on Department of th… (10.60164/xtsmclafh)
References ORCID License
58.36 5
38 Stabilizing Operations Workflow in Construction with Real-Ti… (10.60164/04d4d7c5b)
References ORCID License
52.42 4
39 Development of Interpretative Structural Modelling (ISM) Bas… (10.60164/27b6f6h3e)
References ORCID License
52.42 4
40 A lean and agile construction system as a set of countermeas… (10.60164/37h2e6h7e)
References ORCID License
52.42 4
41 Flexibility in Long-Term Contractual Relationships: The Role… (10.60164/d4b8d1i3b)
References ORCID License
52.42 4
42 Key Planning Steps Enabling Systematic Lean Implementation o… (10.60164/g6g0b3i4b)
References ORCID License
52.42 4
43 Value Delivery through Product Offers: A Lean Leap in Multi-… (10.60164/37d7h3d2i)
References License
50.00 9
44 Decision analysis using virtual first-run study of a viscous… (10.60164/29d1f0f1d)
References ORCID License
45.15 3
45 Synthesizing Last Planner® System, Takt, and Scrum Theory an… (10.60164/3xymkr1ws)
References ORCID License
45.15 3
46 Challenges of Performance Measurement in Lean Construction a… (10.60164/e6a7b8b8e)
References ORCID License
45.15 3
47 Exploring the Use of Lean Construction in Unusual Work Condi… (10.60164/hwbzk23xc)
References ORCID License
45.15 3
48 Lean production, value chain and sustainability in precast c… (10.60164/qrp1u17ka)
References ORCID License
45.15 3
49 Harnessing LPS Metrics for Smarter Resource Allocation and P… (10.60164/wxshl6tcv)
References ORCID License
45.15 3
50 Competition and Collaboration are not mutually exclusive (10.60164/23i2c1c5g)
References ORCID License
35.78 2