2371-8366

Journal of Project Management

Growing Science

Health Score

0 Fair

Metadata coverage

Abstract
ORCID
References
License

Extended metadata coverage

Informational — signals of interoperability and funding across the corpus. Not part of the health score.

Funding

Funder
Award / grant

Affiliation & institutional identifiers

Affiliation
ROR ID

Update policy

Update policy

Your prioritized action plan

Ordered by how many DOIs each fix touches — start here, not with every error at once.

1

Attach ORCID iDs across 324 articles

ORCID iDs strengthen author disambiguation and institutional reporting.

High impact324 DOIs
2

Add license metadata to 324 records

License metadata tells indexers and readers how each article may be reused.

High impact324 DOIs
3

Add abstracts to 81 articles

Abstracts are what surface your work in Google Scholar, Dimensions, and OpenAlex.

Low impact81 DOIs

DOIs for this ISSN

Showing the top 5 of 324 DOIs, ordered by correction priority.

# Title Missing Priority Citations
1 Resource-constrained project scheduling problem: review of p… (10.5267/j.jpm.2018.1.005)
Abstract ORCID License
148.67 95
2 The sustainable project management: A review and future poss… (10.5267/j.jpm.2018.2.001)
Abstract ORCID License
122.51 42
3 Using fuzzy logic to improve the project time and cost estim… (10.5267/j.jpm.2018.4.002)
Abstract ORCID License
113.89 32
4 Critical success factors of ERP implementation in SMEs (10.5267/j.jpm.2019.6.001)
Abstract ORCID License
112.89 31
5 Towards a sustainable construction industry: Delays and cost… (10.5267/j.jpm.2020.1.001)
Abstract ORCID License
107.35 26
6 A CRITIC-TOPSIS framework for hybrid renewable energy system… (10.5267/j.jpm.2018.12.001)
Abstract ORCID License
103.52 23
7 A survey in the resource-constrained project and multi-proje… (10.5267/j.jpm.2019.11.001)
Abstract ORCID License
99.17 20
8 Servant leadership and its effects on IT project success (10.5267/j.jpm.2019.7.001)
Abstract ORCID License
97.58 19
9 Determination of start times and ordering plans for two-peri… (10.5267/j.jpm.2017.9.001)
Abstract ORCID License
94.15 17
10 The scheduling of automatic guided vehicles for the workload… (10.5267/j.jpm.2018.8.001)
Abstract ORCID License
94.15 17
11 Predicting project duration and cost, and selecting the best… (10.5267/j.jpm.2020.3.002)
Abstract ORCID License
92.28 16
12 Application of the AHP and TOPSIS in project management (10.5267/j.jpm.2018.1.001)
Abstract ORCID License
90.31 15
13 Scheduling of multi load AGVs in FMS by modified memetic par… (10.5267/j.jpm.2017.10.001)
Abstract ORCID License
88.21 14
14 Risk management and risk management performance measurement… (10.5267/j.jpm.2020.5.001)
Abstract ORCID License
88.21 14
15 Implementation of multi-criteria decision making approach fo… (10.5267/j.jpm.2017.3.001)
Abstract ORCID License
83.55 12
16 A state-of-art survey on project selection using MCDM techni… (10.5267/j.jpm.2017.6.001)
Abstract ORCID License
83.55 12
17 Reduction of rejection of cylinder blocks in a casting unit:… (10.5267/j.jpm.2019.1.002)
Abstract ORCID License
83.55 12
18 Material handling robots fleet size optimization by a heuris… (10.5267/j.jpm.2019.4.002)
Abstract ORCID License
83.55 12
19 Impacts of change management on risk and cost management of… (10.5267/j.jpm.2019.1.005)
Abstract ORCID License
80.94 11
20 Using a metaheuristic algorithm for solving a home health ca… (10.5267/j.jpm.2019.8.001)
Abstract ORCID License
80.94 11
21 Structural equation modeling of critical success factors in… (10.5267/j.jpm.2022.11.002)
ORCID License
79.55 38
22 Modeling and analyzing the impact of lean principles on orga… (10.5267/j.jpm.2017.5.001)
Abstract ORCID License
78.10 10
23 A simheuristic for bi-objective stochastic permutation flow… (10.5267/j.jpm.2019.1.003)
Abstract ORCID License
78.10 10
24 Production lessening analysis of manufacturing unit in India… (10.5267/j.jpm.2019.5.001)
Abstract ORCID License
78.10 10
25 R-method: A simple ranking method for multi-attribute decisi… (10.5267/j.jpm.2021.5.001)
ORCID License
77.20 34
26 Green building project management: obstacles and solutions f… (10.5267/j.jpm.2017.1.003)
Abstract ORCID License
75.00 9
27 Project manager selection based on project manager competenc… (10.5267/j.jpm.2017.1.004)
Abstract ORCID License
75.00 9
28 An application of fuzzy BWM for risk assessment in offshore… (10.5267/j.jpm.2019.3.001)
Abstract ORCID License
75.00 9
29 Multi objective project portfolio selection (10.5267/j.jpm.2019.6.003)
Abstract ORCID License
75.00 9
30 Risk and its impacts on time and cost in construction projec… (10.5267/j.jpm.2020.6.002)
Abstract ORCID License
75.00 9
31 Project portfolio selection of banking services using COPRAS… (10.5267/j.jpm.2017.6.004)
Abstract ORCID License
71.57 8
32 Performance evaluation of project management system based on… (10.5267/j.jpm.2018.4.003)
Abstract ORCID License
71.57 8
33 Investigating the effects of building information modeling c… (10.5267/j.jpm.2018.8.002)
Abstract ORCID License
71.57 8
34 Selecting a portfolio of projects considering both optimizat… (10.5267/j.jpm.2019.8.003)
Abstract ORCID License
71.57 8
35 Fight against COVID-19: A global outbreak response managemen… (10.5267/j.jpm.2020.3.001)
Abstract ORCID License
71.57 8
36 Portfolio scheduling: an integrative approach of limited res… (10.5267/j.jpm.2019.12.001)
Abstract ORCID License
67.73 7
37 Evaluation of physician in triage impact on overcrowding in… (10.5267/j.jpm.2020.8.002)
Abstract ORCID License
67.73 7
38 The relationship among performance risk, safety risk, social… (10.5267/j.jpm.2020.8.003)
Abstract ORCID License
67.73 7
39 The utilization of project risk monitoring and control pract… (10.5267/j.jpm.2021.7.002)
ORCID License
63.94 18
40 Integrated multi-resource planning and scheduling in enginee… (10.5267/j.jpm.2017.5.003)
Abstract ORCID License
63.38 6
41 A fuzzy leader-follower game approach to interaction of proj… (10.5267/j.jpm.2018.1.003)
Abstract ORCID License
63.38 6
42 Application of TODIM (TOmada de Decisao Interativa Multicrit… (10.5267/j.jpm.2018.3.002)
Abstract ORCID License
63.38 6
43 Projects portfolio determination based on key stakeholders’… (10.5267/j.jpm.2019.10.001)
Abstract ORCID License
63.38 6
44 Project portfolio selection problem with exponential synergi… (10.5267/j.jpm.2019.2.001)
Abstract ORCID License
63.38 6
45 Synergies in merger & acquisition: A case study of SMEs… (10.5267/j.jpm.2020.6.001)
Abstract ORCID License
63.38 6
46 Competitive advantage to enhance internationalization and ma… (10.5267/j.jpm.2020.9.002)
ORCID License
61.52 16
47 Modeling projects interdependencies to measure their synergi… (10.5267/j.jpm.2021.2.003)
ORCID License
60.21 15
48 The impact of artificial intelligence capabilities on the su… (10.5267/j.jpm.2025.3.007)
ORCID License
60.21 15
49 Comparison and analysis of PMBOK 2013 and ISO 21500 (10.5267/j.jpm.2017.1.002)
Abstract ORCID License
58.36 5
50 A mathematical model for crashing projects by considering ti… (10.5267/j.jpm.2017.5.002)
Abstract ORCID License
58.36 5